Base preparation

Strongly absorbing (absorbent) bases are necessary for processing first coat IVSIL BASE or IVSIL TIE-ROD.

Mixing of mortar

Bag contents to pour out in capacity with pure water from calculation of a dry mix of 1 kg on 0,18 l of water and carefully to mix manual, or machine way before reception of homogeneous paste like mass. A ready solution to sustain 10 minutes and mix again.

 

Application

Ready mix to pour out on the base and to distribute on the area thoroughly and in regular intervals condensing a material. Air and base temperature should be from +5 ° to +30 °. During the period , it is necessary to exclude fast drying-out of structure. To use a coating it is possible in 48 hours. Full durability is reached in 28 days.

 
Consultation on the pplication materials

-150

  

Use for laying of walls and parting walls brick and others fine elements, a screed coat of floors manually, etc. For exterior and internal works are applied to a plastering of the big and small areas. Are made of the high-quality cement, enriched river and pit sand, with application of the special additives improving properties of a product. Mixes are made according to GOST 28013-98. For exterior and internal works. Plaster mix IVSIL -150 is applied to a plastering of the big and small areas. Laying mix IVSIL -150 is applied to a laying of walls and parting walls brick and others fine elements. Universal mix IVSIL -150 is applied to a brickwork, facing plaster of walls, a screed coat of floors manually, etc.

 
 

Technical characteristics

Mixing proportion: 1l of water
On 50 kg of a mix9,0
The consumption at a thickness of a layer of 10 mm, on 1 sq. m2 2,5 kg
Viability of a solution2 3 hours
Hardening time2 3 days
Achievement of full durability28 days
Temperature of works and the baseFrom +5 to +30
Durability on compression15 MPa
Frost resistance50 cycles
Packaging50 kg bag
Firmness to temperaturesFrom -50 to +60
Maximum size of a filling material2 2,5 mm
 
Packaging and storage
The dry mix is delivered in 50 kg Kraft-bags. A storage warranty period in a dry premise in packaging materials of the manufacturer is 6 months from the date of the manufacturing, specified in packing.
The consumption
Average consumption 1,4 - 1,8 kg of dry mix on 1 m. of a sq. surface at a thickness of a layer of a solution of 1 mm. The exact consumption depends on degree of flatness (relief) of the base.
 